CBM

Setups:

  • muon setup - STS + MUCH + TRD + TOF + BFTC + PSD in parking position
  • electron setup - MVD + STS + RICH + TRD + TOF + BFTC + PSD
  • hadron setup - STS + TRD + TOF + BFTC + PSD in parking position

Histogram normalization (running scenario):

  • beam intensity:
    • muon and hadron setups - 109 Au/s
    • electron setup - 108 Au/s
    • mCBM - 107 ion/s
  • length of beam time for radiation environment calculations:
    • during CBM experiment - 1 month of beam
    • during mCBM beamtime - 1 day of beam
    • after beam shutdown - 2 months of beam

Grid:

  • cave 50×50×50 cm3
  • E10 service area 50×50×50 cm3
  • magnet gap 5×5×5 cm3
  • mCBM cave 7.5×6×11 cm3

XY pictures are opposite to beam direction

Used CBMROOT geometries

Impressum         Datenschutz         Contact: Anna Senger a.senger(at)gsi.de        


Activation study (CBM)


mCBM


Radiation environment in cave, in magnet gap, in E10 service area and in mCBM cave

root files download