Link to ladder: L8UL201022
Module [ Site: GSI] versions: M8UL2T3010223B2 |
QR pdf
FEB_A: 1230 FEB_B: 2220 -- Last status: 2026-03-20 17:53 [ Tested Uplinks ]
Desired grade: C
History of statuses:
Comments:
- 2026-03-20 17:53 { Anju Sharma } ( Slightly high noise for z-strips )
- 2026-03-16 16:36 { Johann Heuser } ( ASICs have been replaced. Full test in HL needed. )
- 2026-02-19 09:34 { Oleksandr Suddia } ( Recovered 18.02.2026 )
- 2026-02-18 09:50 { Oleksandr Suddia } ( Chip 0 has been replaced, BUT instead of the PSB & PST microcable, a PLB & PLT cable was installed, which is 1-1.5 cm longer. Can we live with this? )
- 2026-02-04 11:21 { Anju Sharma } ( Sorry for previous comment. Corrected : Low ODI (1.7kohm, HW_ID 1, UL 0) )
- 2026-02-04 11:18 { Anju Sharma } ( ODI is okay )
- 2026-02-02 16:31 { Anju Sharma } ( Retested )
- 2025-10-07 09:09 { Uli Frankenfeld } ( fix DB )
- 2025-03-18 15:20 { Lady CollazoSanchez } ( ENC pattern )
No documents uploaded yet.
⇧ Top
Change Module Status:
Ladder: L8UL201022
Module: M8UL2T3010223B2
Sensor: 12044
Status: Tested Uplinks